| lv520xin71's Forum Info |
| Joined: |
05-21-2019 |
| Last Visit: |
05-21-2019, 06:47 AM |
| Total Posts: |
0 (0 posts per day | 0 percent of total posts) |
| Total Threads: |
0 (0 threads per day | 0 percent of total threads) |
| Time Spent Online: |
2 Minutes, 11 Seconds |
| Reputation: |
0
[Details] |
|
|
| Additional Info About lv520xin71 |
| Location: |
http://www.zheaomould.com/cleaning-ware-mould/ |
| Bio: |
● Part Name: Plastic Broom Injection Mould
● Product Size: Various
● Cavity / Core: P20
● Mould Cycle Time: 20 Seconds
● Mould life: 300K
There are a lot of different plastic broom design, which will require different mould structure.
While in Zheao, a lot of broom moulds have been made before. Good experiecen makes us to achive better mould quality and mould life.
Work Process
Our Advantage:
● Strict process control to make sure the lead time catching.
● Good after-sale service and technical support.
● Outstanding merchandise and considerate 24 hours on line customer service
● Reasonable price.
FAQ:
Q: Are you mould factory?
A: Yes, we are mould manufacturer with export certification.
Q: What’s the software you will use to check the drawing? And what’s format of drawing you can check?
A: Our designers and engineers all use AUTOCAD and UG software to check 2D and 3D drawings.
We can check the drawings with PDF, DWG (CAD) and STP (3D) x_t(3D), or IGS (3D) formats.
Q: How do I pay for the order?
A: The common payments are T/T (Telegraphic Transfer).Cleaning Ware Mould factory
website:http://www.zheaomould.com/cleaning-ware-mould/ |
| Sex: |
Undisclosed |
|